HAZOP Workshop |
|
Eastern Goldfields Pipeline and Stations Parmelia Relocation Forrestfield Mondarra Storage Facility PGP Import Facilities |
Over Pressure Shut Off Project for Pressure Reduction Stations across WA |
||
AS2885 Safety Management Study Risk Assessment (incl. Location Class Review)
|
|
Granny Smith Metering Station |
Neerabup Pipeline |
||
Xyris Pipeline |
||
HAZID (Construction, Commissioning and Operations) |
Onslow Gas Pipeline Capacity Upgrade Project |
|
|
Mondarra Storage Facility M9 Flowline and Infrastructure |
|
Pipeline Risk Assessments (SMS) / Third Party Crossings |
Baldivis DN1400 Water Main (Crossing APA Pipeline) |
|
Operations Manuals and Compentency Assessments Training Preparation and Delivery |
|
West Angeles Power Station (Pipeline Module) Turee Creek Compressor Station |
Integrity Assessments |
|
Cockburn Cement Pipeline Thunderbox Pipeline |
Pipeline Integrity Management Plan |
Albany Port Liquid Petroleum Pipeline |
|
Cathodic Protection and DCVG Surveys
|
Neerabup Pipeline |
|
Pipeline Excavation, Inspection and Repair |
|
Cape Lambert Pipeline (ILI Verification) |
In Line Inspection (ILI) – Project Management and Project Engineering |
Worsley Lateral (Forward and Reverse) |
|
Pipeline Management Plans / Operation Safety Case |
Albany Port Liquid Petroleum Pipeline
|
|
Operational Safety Case Audit |
Neerabup Pipeline |
|
Pipeline Engineering Design |
Senecio – Waitsia Pipeline and Flowlines Detailed Design |
|
Cathodic Protection Design and Installation |
Atco HP054 Pipeline Forrestfield Airport Link Relocation Project |
|
Easement Works (Easement Patrols, Sign Installation Projects, Pot Holing, Vegetation Management)
|
Neerabup Pipeline |
|
Cathodic Protection Rectification Works |
|
Parmelia Gas Pipeline (2016) |